The University of Nottingham - Estates Office Space Database The University of Nottingham - Estates Office Space Database  
The Boots Science Building
 Jump to floor...
 
Export the data to a csv file.

Floor A
Room Description Type Usage Code Usage Area
 A.CD01    Atria / Lobby ZZ  Balance 28.29 
 A.CD02    Corridor ZZ  Balance 10.81 
 A.CD03    Corridor ZZ  Balance 558.53 
 A.LS01    Lift ZZ  Balance 10.38 
 A.ST01    Stair ZZ  Balance 18.69 
 A.ST04    Stair ZZ  Balance 19 
 A1  -  Plant Room ZZ  Balance 7.7 
 A11    Plant Room ZZ  Balance 9.68 
 A15    Plant Room ZZ  Balance 13.36 
 A18    Plant Room ZZ  Balance 57.77 
 A19    Plant Room ZZ  Balance 18.85 
 A4    Plant Room ZZ  Balance 49.07 
 A8    Plant Room ZZ  Balance 6.35 
 B.ST03    Stair ZZ  Balance 8.25 

Floor B
Room Description Type Usage Code Usage Area
 B.CD01  -  Corridor ZZ  Balance 132.53 
 B.CD02    Corridor ZZ  Balance 29.43 
 B.CD03  -  Corridor ZZ  Balance 21.37 
 B.CD05  -  Corridor ZZ  Balance 23.55 
 B.CD06  -  Corridor ZZ  Balance 21.04 
 B.CD07    Corridor ZZ  Balance 19.82 
 B.LS01  -  Lift ZZ  Balance 10.29 
 B.RS01  -  Duct / Riser ZZ  Balance 5.69 
 B.RS02  -  Duct / Riser ZZ  Balance 6.69 
 B.RS021    Duct / Riser ZZ  Balance 0.61 
 B.RS022    Duct / Riser ZZ  Balance 0.74 
 B.RS023    Duct / Riser ZZ  Balance 0.59 
 B.RS03  -  Duct / Riser ZZ  Balance 6.69 
 B.RS04  -  Duct / Riser ZZ  Balance 8.13 
 B.RS221    Duct / Riser ZZ  Balance 0.64 
 B.RS222    Duct / Riser ZZ  Balance 0.63 
 B.ST01    Stair ZZ  Balance 3.34 
 B.ST02  -  Stair ZZ  Balance 18.17 
 B.ST04  -  Stair ZZ  Balance 20.66 
 B11A  -  Corridor ZZ  Balance 11.03 
 B18  Accessible Toilet  WC ZZ  Balance 3.54 
 B20  Male Toilet  WC ZZ  Balance 10.56 
 B21  Female Toilet  WC ZZ  Balance 10.73 

Floor C
Room Description Type Usage Code Usage Area
 C.CD01    Corridor ZZ  Balance 62.97 
 C.CD02    Corridor ZZ  Balance 29.37 
 C.CD03    Corridor ZZ  Balance 19.46 
 C.CD05    Corridor ZZ  Balance 14 
 C.CD06    Corridor ZZ  Balance 9.42 
 C.CD07    Corridor ZZ  Balance 29.23 
 C.LS01  -  Lift ZZ  Balance 10.3 
 C.RS01  -  Duct / Riser ZZ  Balance 5.69 
 C.RS02  -  Duct / Riser ZZ  Balance 6.69 
 C.RS021    Duct / Riser ZZ  Balance 0.61 
 C.RS022    Duct / Riser ZZ  Balance 0.74 
 C.RS023    Duct / Riser ZZ  Balance 0.59 
 C.RS03  -  Duct / Riser ZZ  Balance 6.69 
 C.RS04  -  Duct / Riser ZZ  Balance 8.13 
 C.RS191    Duct / Riser ZZ  Balance 0.61 
 C.RS192    Duct / Riser ZZ  Balance 0.73 
 C.ST02    Stair ZZ  Balance 18.17 
 C.ST04    Stair ZZ  Balance 20.87 
 C12A  -  Corridor ZZ  Balance 11.06 
 C20  Male Toilet  WC ZZ  Balance 8.71 
 C21  Female Toilet  WC ZZ  Balance 4.28 
 C22  -  Plant Room ZZ  Balance 2.5 
 C22a  -  Plant Room ZZ  Balance 0.69 

Floor D
Room Description Type Usage Code Usage Area
 D.CD01    Corridor ZZ  Balance 72.15 
 D.CD02    Corridor ZZ  Balance 29.3 
 D.CD03    Corridor ZZ  Balance 21.47 
 D.CD05    Corridor ZZ  Balance 1.56 
 D.CD06    Corridor ZZ  Balance 21.81 
 D.CD07    Corridor ZZ  Balance 3.74 
 D.CD08    Corridor ZZ  Balance 3.79 
 D.LS01  -  Lift ZZ  Balance 10.2 
 D.RS01  -  Duct / Riser ZZ  Balance 5.69 
 D.RS02  -  Duct / Riser ZZ  Balance 6.69 
 D.RS021    Duct / Riser ZZ  Balance 0.61 
 D.RS022    Duct / Riser ZZ  Balance 0.74 
 D.RS023    Duct / Riser ZZ  Balance 0.59 
 D.RS03  -  Duct / Riser ZZ  Balance 6.64 
 D.RS04  -  Duct / Riser ZZ  Balance 8.13 
 D.RS271    Duct / Riser ZZ  Balance 0.61 
 D.RS272    Duct / Riser ZZ  Balance 0.73 
 D.ST02    Stair ZZ  Balance 18.17 
 D.ST04    Stair ZZ  Balance 20.75 
 D12A  -  Corridor ZZ  Balance 11.09 
 D21  Accessible Toilet  WC ZZ  Balance 3.6 
 D22  Male Toilet  WC ZZ  Balance 7.03 
 D23  -  Plant Room ZZ  Balance 1.69 
 
All area measurements are in m²
 
Back To Building