|
| C17 | ||
|---|---|---|
|
||||||
| Room Details | |
| Room Number: | C17 |
| Building: | Energy Technologies Building (7360) |
| Description: | |
| Room Type: | Laboratory Secondary/Tertiary |
| Area (m²): | 104.65 |
| Capacity: | 8 |
| Notes: | Cleaner Fossil Energy & Carbon Capture Technologies (CFECCT) research group |
| Occupier Details | |
| Faculty: | UK - Engineering |
| School: | Engineering |
| Department: | Mechanical, Materials and Manufacturing Engineering |
| Occupied Area (m²): | 104.65 |
| Use: | Research - Other |