|
| B27a | ||
|---|---|---|
|
||||||
| Room Details | |
| Room Number: | B27a |
| Building: | L4 Laboratories (1321) |
| Description: | |
| Room Type: | Laboratory Primary |
| Area (m²): | 41.54 |
| Capacity: | 8 |
| Notes: | Cleaner Fossil Energy & Carbon Capture Technologies (CFECCT) and Advanced Materials research groups |
| Occupier Details | |
| Faculty: | UK - Engineering |
| School: | Engineering |
| Department: | Chemical and Environmental Engineering |
| Occupied Area (m²): | 41.54 |
| Use: | Teaching - Other (50%) |
| Research - Other (50%) | |